Hardships of the floor to move back home , thinking this done , NO, NO, NO, This successful three tenths of it , oh. Put all their hopes in the floor fitters who is wrong, the head of household must also know twelve , to be effective supervision . Bell floor Xiaobian to introduce elements installed parquet .

First, before laying : a recognition of the three do not shop :

Laying workers should be described in detail before laying paving process , the user must be authorized only after the construction . If you encounter the following, not construction , but must clearly explain to the user , and to clarify the reasons:
1 , the ground does not dry ( wet ) , not clean, not construction wpc composite decking;
2 , not construction termite surroundings ;
3 , the construction site cross-mixing operations, not construction ;

Second, the law laying parquet suspension

1, the primary surface ( ground ) treatment outdoor pergola:
Grass surface requires balanced , dry, clean. There bump at the leveled with a blade , the slope leveled If a small area or recess obviously used gypsum binder mix of 30% sand smooth , until the surface of the floating dry sweep dust or other impurities. Strive to smooth , not seeking smooth . Base flatness higher, should be less than 3mm/2m, otherwise meet the criteria after flooring .

Laying the ground or cottage building shall be waterproof. The methods are: coated waterproof paint or spread agricultural films . When using the agricultural film BEDDING , using floor laying method : that is, when laying the first layer , the film between the film and the corresponding overlapping 20cm; the second layer is laid on the first film , to stagger joints , and wall also upturned 5-6cm ( below baseboards ) .

2 , laying cushion material :
Foam pad : with plastic film thickness of 3mm foam pads, butt laying interfaces plastic .

Foreshadowing treasure: thickness 6-25mm. General election 10-12mm thick , butt laying interfaces plastic .

High-quality multi-layer plywood : Thickness 9-18mm. General election 12mm thick. Each layer plywood should be cut equally small area of ​​less than 0.7 square meters , the best anti-corrosion paint , then use hammer, expansion screws countersunk fixed on the ground, must be firmly around , leaving 3-6mm gap between the board and the board , with tape sealing .

3 , floor coverings
Floor coverings are usually walking towards the room in the same direction , from left to right or from right to left followed by rows of pavement , the grooves between the walls, the floor and the wall into the wedge , leave enough expansion joints, dry areas , floor and humid , expansion joints should stay small ; moist areas , expansion joints should remain large . Check the cable laying flatness of the floor, with the shop to check with the installation .http://7trustwpc.com/

Posted by: qizhenkim at 02:08 AM | No Comments | Add Comment
Post contains 498 words, total size 3 kb.

Comments are disabled. Post is locked.
14kb generated in CPU 0.0163, elapsed 0.0728 seconds.
33 queries taking 0.0628 seconds, 109 records returned.
Powered by Minx 1.1.6c-pink.